How to calculate a reorder point for UK product sellers

GUIDE

How to calculate a reorder point for UK product sellers

Last reviewed

A reorder point is the stock level at which you place the next order, early enough that new units arrive before you run out. A lot of growing product businesses still do not have one written down.

Without it, reordering tends to happen when a listing looks "a bit low", when Amazon sends a restock alert, or when someone has a bad feeling. That works until lead times stretch, a channel takes off, or stock is sitting in the wrong place. Then you are out of stock, or buying in a hurry.

This guide is for UK product businesses selling on their own site, marketplaces, or both. The arithmetic is straightforward. The useful work is being honest about lead time, and setting the figure where the stock actually is.

What is a reorder point, and why does it matter?

A reorder point is not your "ideal" stock level, and it is not a forecast of next month's sales. It is a trigger: when sellable stock reaches this number, you place or release the next purchase order or transfer.

Get it late and you run out while the next delivery is still in transit, or still waiting to be booked in. Get it early, and you tie up cash in stock you do not yet need, and may pay more to store it. A single company-wide number can hide a problem: plenty of units in the business, but not enough in the place you need to fulfil from.

How do you calculate a reorder point?

The UK government's business support site sets the basic formula out clearly. business.gov.uk describes a Periodic Automatic Replenishment (PAR) level as:

(Average daily sales volume × lead time) + safety stock = reorder point

In plain terms: cover the units you expect to sell while you wait for the next delivery, then add a buffer for when demand or the delivery does not behave.

Use a daily sales figure that reflects normal recent demand, not a single busy day or a quiet week you hope will last. If a product is seasonal, use a figure that matches the period you are planning for, and raise it before a peak.

What should you include in lead time?

Lead time is often written down as the supplier's quoted production or shipping time. That is usually too short. It should be the days from the moment you trigger the order to the moment those units are actually available to sell.

For an imported product, include the time to place and confirm the order, make or pick the goods, move them to the UK, clear them, and get them into the location you will sell from — your own warehouse, a 3PL, or Amazon. Booking-in is part of the wait, even after the pallet has arrived.

If you are replenishing Amazon fulfilment from a UK warehouse or 3PL, the relevant lead time is not the original import. It is the time to pick and prep the transfer, move it, and for those units to become sellable in Amazon's network. Receiving can take longer at busy periods. If the last few inbound shipments took longer than the quote, use what actually happened.

How do you set safety stock?

Safety stock is there for variation: demand that runs hotter than your average, and inbound that runs later than your lead time.

There is no single percentage that suits every product. business.gov.uk uses 50% of the lead-time demand as the safety stock in its worked example. That is a useful illustration, not a rule you have to copy. A stable product you can restock in a week may need a smaller buffer than a seasonal import, or a line that would damage the business if it ran out.

A practical way to start is to ask: if demand were a bit higher, or the delivery a bit late, how many days of cover would you want in hand? Convert that into units, then adjust after you see what almost ran out. Hold more buffer on the products that would hurt most to be without, and less on slow lines that are expensive to store and easy to replenish.

What if stock is split across locations?

Calculate the reorder point where the stock will be sold from, not as one lump.

If a product sells from your own location and from Amazon fulfilment, you need a trigger for each. The warehouse figure should cover demand fulfilled from that location during its replenishment lead time, plus a buffer. The Amazon figure should cover FBA demand during the time it takes to get more units sellable there, plus a buffer.

The same logic applies if a 3PL holds the bulk of the stock and feeds both your website and a marketplace. One shared pool is simpler than two, but only if you can see the stock accurately and the reorder point includes the true lead time into that pool. A company-wide unit count is still useful for cash and purchasing. It should not be the only trigger you use.

What does this look like in practice?

The first figures below are the example published on business.gov.uk. It is their illustration, not a recommendation for your products.

  • Average daily sales: 15 units

  • Lead time: 10 days

  • Lead-time demand: 15 × 10 = 150 units

  • Safety stock in their example: 50% of 150, which is 75 units

  • Reorder point: 150 + 75 = 225 units

In that example, you would place the next order when sellable stock reaches 225 units.

Illustrative example. The second set of figures is an illustrative example only. It is not from a real business, and the numbers are not typical rates or recommended buffers.

A UK seller has the same product in two places. From their own warehouse it sells 20 units a day, and the full inbound lead time — order, freight, and booking in — is 21 days. They choose an illustrative safety stock of 80 units. Warehouse reorder point: (20 × 21) + 80 = 500 units.

From Amazon fulfilment it sells 8 units a day. Replenishment from the warehouse takes, in this example, 7 days to become sellable, and they choose an illustrative safety stock of 32 units. Amazon replenishment trigger: (8 × 7) + 32 = 88 units.

The useful point is not the particular numbers. It is that the two triggers are different, because the demand and the lead time are different. Using only the 500-unit figure, or only a restock alert, would miss that.

What should you review, and how often?

Recalculate when demand or a supplier's actual lead time changes, and before a peak. After a peak, look at what nearly ran out and whether stock was in the wrong place. If you import, the true unit cost of holding a bit more stock — or of running out — is easier to judge when you know your landed cost.

If it would help to work through reorder points, stock locations or replenishment for your business, this is the kind of operations and inventory work I cover in Operations, AI & Efficiency and Sourcing & Importing. A Discovery Call is free, and the usual starting point for a fuller look is the Ecommerce Growth & Operations Review.

Sources

Frequently asked questions

Is a reorder point the same as a minimum stock level?

Not exactly. A minimum might be a floor you never want to go below. A reorder point is the level at which you act so that, after lead time, you do not breach that floor. If you treat the minimum as the trigger, you are already late.

Should I use Amazon's restock alerts as my reorder point?

They can be a useful prompt, but they should not be the only one. Alerts may not include your true lead time into Amazon, or demand on your other channels. Set your own trigger, then use the alert as a check.

How often should I recalculate?

Review the figures when sales or lead times change, and at least before and after a peak. A quiet, stable line may not need a monthly change. A seasonal or imported line often will.

Do I need a different reorder point for each warehouse or fulfilment location?

Yes, if those locations serve different demand or have different lead times. A single total can make the business look well stocked while one channel is about to run out.

Is 50% safety stock a rule?

No. It is the buffer used in the worked example on business.gov.uk. Use a buffer that reflects how variable the product is, how long it takes to replenish, and how costly a stockout would be.

LET’S TALK

Want to see if we’re a fit?

Book a free Discovery Call — a no-obligation conversation about where you are and what would help.